
During the Mapping phase, SGE evaluates your site to determine if a renewable energy project is economically feasible. This requires an in-depth study to verify that there are no “fatal flaws” due to regulatory barriers or site characteristics.
Fatal flaws can include:


55 John Clarke Road, Middletown RI 02842 · p 401.849.0810 · f 401.846.4169 · info@sge-corp.com · © 2009 SGE. All rights reserved. · site by C. Murray Consulting